Georgia · Data center compliance

Georgia data center compliance guide: federal, state and local requirements

Georgia remains one of the friendliest states for data centers at the state level: the 2026 General Assembly kept the sales tax exemption, and the Public Service Commission's large-load rule makes new Georgia Power customers over 100 MW cover the grid costs they cause. The tightening is happening county by county.

Updated

Serving City of Atlanta, Fulton & Douglas counties, Coweta County, Newton County, Troup County (LaGrange), Jackson, Hall, Bartow & exurbs and DeKalb County in Georgia.

At a glance

Georgia data center rules at a glance

  • 2031

    Data center sales tax exemption runs through 2031 after 2026 repeal bills died

  • 100 MW+

    New Georgia Power customers who must pay their grid costs under the PSC rule

  • Dec. 23, 2026

    Coweta County's data center moratorium expires

  • End of 2026

    PSC investigation of RTP fuel costs due

Key takeaways for Georgia data center projects

  • Georgia data centers answer to Georgia EPD (air, watershed and land protection), the Public Service Commission, the Dept. of Community Affairs and regional commissions, the Safety Fire Commissioner, and county and city governments.
  • The PSC's January 2025 rule makes Georgia Power customers over 100 MW pay grid costs, accept minimum bills and submit contracts for PSC review.
  • Coweta, DeKalb, Cherokee and other counties have paused applications while writing data center ordinances; DeKalb’s pause, begun in 2025, now runs to Mar. 30, 2027.
  • Expect repeal, disclosure and NDA bills to return in the 2027 session.
Recent and pending laws

What’s changed for Georgia data centers

The rules moving fastest right now. Each entry shows its status and the dates to watch.

  1. Date: 2026 session

    SB 34 / HB 1063

    Keep data center grid costs off residential bills; longer contracts, deposits

    Status: Did not pass

  2. Date: Nov. 20, 2025

    DCA DRI rules

    Data centers 300,000–500,000 sq ft+ get regional review; water and power estimates

    Status: Adopted

  3. Date: Aug. 2026

    Georgia Power–OpenAI contract

    3.2 GW Effingham County load; OpenAI pays full service cost, minimum bills and collateral

    Status: Approved

  4. Date: July 2026

    PSC RTP fuel-cost investigation

    Reviews whether data centers on Real-Time Pricing shift fuel costs to others

    Status: Due end of 2026

  5. Date: 2025–Mar. 2027

    County moratoria

    Coweta, DeKalb, Cherokee and others pause applications

    Status: Active

  6. Date: Apr. 2026

    SB 410 / SB 408 / SB 436

    Repeal, sunset or suspend the sales tax exemption

    Status: Died

  7. Date: 2026 session

    SB 421 / HB 528

    Energy and water disclosure for 30 MW+ (HB 528); ban on local NDAs over usage data

    Status: Did not pass

  8. Date: Jan. 23, 2025

    PSC large-load rule

    100 MW+ customers pay grid costs; minimum bills; contract review

    Status: In effect

Who regulates what

Four layers of oversight on every Georgia project

A compliant Georgia data center has to clear federal rules, state agency permits, local approvals and utility requirements at the same time.

  • Federal

    • U.S. EPA (air, water, SPCC, EPCRA)
    • U.S. Army Corps of Engineers
    • OSHA
    • FAA
    • FERC / NERC
  • State

    • Georgia EPD (Air Protection, Watershed Protection, Land Protection)
    • Georgia Public Service Commission
    • Dept. of Community Affairs / regional commissions
    • Office of Insurance & Safety Fire Commissioner
    • Dept. of Revenue / GDEcD
  • Local

    • Counties, cities and development authorities
  • Utility & grid

    • Georgia Power
    • EMCs (e.g., via Oglethorpe Power)
    • MEAG cities
    • Water and sewer authorities
Lifecycle

Georgia requirements from site selection to decommissioning

  1. 01

    Site selection

    Check the county ordinance and any active moratorium, whether DRI review applies (data centers now have their own threshold), and water and power capacity at the site.

  2. 02

    Permitting & construction

    EPD air permits (often synthetic minor) for generator fleets, NPDES construction stormwater, state minimum building and fire codes, and county land disturbance permits.

  3. 03

    Operations

    Air permit limits and reporting, PSC-reviewed Georgia Power contract terms and minimum bills, water use and discharge permits, and sales tax exemption compliance.

  4. 04

    Decommissioning

    Close fuel tanks under EPD rules, terminate air permits, handle batteries and electronics properly and meet county restoration conditions.

On your jobsite

What this means on your jobsite

  1. Site selection

    In Georgia, most of the risk is local: the county’s rules and the ground under the site. Check both before you close.

    • Soils and foundations

      Metro Atlanta and North Georgia sit on Piedmont residual soils, where large mat foundations have settled well beyond their predicted values.

      You'll need: geotechnical borings and early testing to confirm the design assumptions

    • Environmental history

      Lenders and buyers will expect a Phase I environmental site assessment before acquisition, and a Phase II if it flags concerns.

      You'll need: an ASTM-based Phase I in the diligence file

    • County rules and moratoria

      Coweta, DeKalb, Cherokee and other counties paused data center applications in 2026 while writing ordinances on noise, water and buffers. Data centers of 300,000 square feet or more in urban and suburban metro Atlanta, or 500,000 elsewhere, also trigger DCA’s Developments of Regional Impact review.

      You'll need: the county’s current ordinance and moratorium status, plus any DRI filing

    • Who runs inspections

      Georgia’s state minimum codes, now the 2024 IBC with Georgia amendments, apply statewide, but each county or city runs its own permitting and inspection program.

      You'll need: a decision now on who will act as your independent inspection and testing agency

  2. Permitting & construction

    Georgia permitting runs through EPD and the county, and both expect field records, not just plans. Start building the file on day one.

    • Special inspections

      Georgia’s 2024 IBC requires third-party special inspections of structural concrete, steel, welding and fireproofing, reviewed by the local building official.

      You'll need: an approved special inspection agency and daily reports the building official will accept

    • Welds and structural connections

      Structural steel, pipe supports and generator skids need weld inspection and nondestructive testing before they’re covered up.

    • Construction stormwater

      Disturbing an acre or more needs EPD NPDES construction stormwater coverage and an erosion control plan, and the permit requires turbidity sampling after qualifying rain events.

      You'll need: inspections by certified personnel, documented throughout the build

    • Generators and fuel

      Generator fleets need a Georgia EPD air permit, often as a synthetic minor source with fuel or run-hour caps, and the fuel storage brings tank rules and a federal SPCC plan.

      You'll need: generator specifications, run-hour limits and tank documentation ready to file

    • Commissioning before energization

      Under PSC rules, Georgia Power customers of 100 MW or more sign long-term contracts with minimum bills, so a late energization costs real money.

      You'll need: commissioning records and integrated systems test results showing the systems perform as designed

  3. Operations

    Once you’re live, compliance becomes a matter of records: who tested what, when, and against which standard.

  4. Decommissioning

    The fastest way to lose value at end of life is a site with undocumented contamination or orphaned tanks.

    • Tank closure

      Underground fuel tanks must be closed under EPD’s UST rules, with 30 days’ notice, soil sampling and a closure report.

      You'll need: inspection and sampling before the tanks come out

    • Batteries and hazardous materials

      UPS and battery energy storage systems need proper removal, handling and recycling records, as do any EPCRA-reportable chemicals on site.

    • Exit assessment

      A post-operations environmental assessment protects the seller and the next owner.

Key local jurisdictions

Where Georgia rules get local

Zoning, noise, water and moratoria vary county by county. Confirm the current ordinance before you file.

  • City of Atlanta

    A special use permit is required citywide; data centers are barred near the BeltLine and transit.

  • Fulton & Douglas counties

    Established industrial corridors; Douglas paused applications in 2025, and big campuses still draw opposition.

  • Coweta County

    180-day moratorium through Dec. 23, 2026 while the ordinance is tightened.

  • Newton County

    Hyperscale campuses and on-site power; scrutiny of permit timing.

  • Troup County (LaGrange)

    A 90-day 2025 moratorium paused data center applications while the county amended its Unified Development Ordinance.

  • Jackson, Hall, Bartow & exurbs

    Growing pipeline; water and power capacity can delay approvals.

  • DeKalb County

    Pause in place since July 2025, extended to Mar. 30, 2027 after draft rules were rejected; a developer has sued.

How ATS + SGS help

One testing, inspection and certification partner for the whole build

  • Construction & code compliance

    Materials testing, special inspections and nondestructive testing so your Georgia build passes inspection the first time.

    • Code compliance
    • NDT inspection
  • Electrical, fire & commissioning

    Electrical and fire protection testing, generator and UPS verification, and commissioning support before go-live.

    • Fire & electrical
    • Commissioning
  • Environmental & due diligence

    Environmental compliance support, technical due diligence for investors and insurers, and ESG assurance.

    • Technical due diligence
    • ESG assurance
FAQ

Georgia data center compliance questions

A Georgia data center typically needs a Georgia EPD air permit for its backup generators (large fleets are often permitted as synthetic minor sources), NPDES construction stormwater coverage, a county land disturbance permit, county or city zoning approval (with DRI review for large projects), and building and fire permits. Georgia Power customers over 100 MW also need a PSC-reviewed contract.

This page summarizes Georgia data center requirements as of October 12, 2026 for general information. It is not legal advice. Confirm current requirements with the relevant agency or counsel before filing.

Bring one TIC partner to your next Georgia data center project

Tell us where you're building and what role you play. We'll route you to the right ATS specialist.

Other states

Data center compliance guides by state

Georgia

No statewide limits: the sales tax break survived 2026 and PSC rules make 100 MW+ loads pay their grid costs, but Coweta, DeKalb, Cherokee and other counties have paused applications.